Technical floors · Raised access floor
Bois condenséPT38
CBI
Raised access floor applications
- Offices and open spaces Makes it easy to integrate cabling without having to chase into the floor
- Data centres Enables cable management and air circulation for cooling servers
- Control rooms and industrial environments: Provides a safe passage for technical equipment
Show more (1)
- Commercial spaces and showrooms Offering flexibility and adaptability to suit needs
- Brand
- CBI
- Reference
- PT38
- Thickness
- 38 mm
- Format
- Tile
- Family
- Raised access floor
- Modular structure: Made up of removable tiles laid on a steel or aluminium structure, allowing quick access to the installations below
- Various materials: Technical chipboard tiles
- Adjustable height: The structure allows the height to be adjusted according to the volume of cabling and equipment required
- Cable and fluid management: Provides a dedicated space for organising and protecting electrical cables, networks, air conditioning, etc.
- Safety and strength: Supports heavy loads and can include antistatic, fire-retardant or acoustic properties as required
- Easy maintenance and scalability: Quick access to installations for maintenance and modifications
Technical specifications, CBI data sheet
| Format | 600 × 600 mm |
|---|---|
| Thickness | 38 mm |
| Panel weight | 10 kg |
| Core | High-density woodcore |
| Core density | 720 kg/m³ |
| Bottom covering | Aluminium foil 0.05 mm |
| Edge | ABS 0,5 mm |
| Top covering | Bare, aluminium, HPL, PVC, linoleum or rubber, as required |
| Reaction to fire (EN 13501-1) | Bfl-s1 |
| Fire resistance (EN 13501-2) | REI 30 |
| Airborne sound insulation | Dn,f,w 52 dB |
| Impact sound | Ln,f,w 44 dB |
| Walking sound | ΔLw 24 dB |
| Load at 2.5 mm deflection | 4.0 kN |
| Ultimate load | 11.5 kN |
| Load class EN 12825 | 5 |
| Life expectancy | 25 years |
| Manufacturer warranty | 24 months |
Quote
A quote for Bois condensé · PT38
Tell us the surface area, the type of premises and your wilaya: we reply with a detailed supply-and-installation quote.
In the same family
On our sites
Sonatrach, MTBE Arzew.
1,000 m² of raised floor laid by our crews, from frame to finished room.
02 Pedestals set and levelled
03 Panels laid
04 Room handed over

