Skip to content
ODECOR
Sulfate de calcium
Sulfate de calcium

Technical floors · Raised access floor

Sulfate de calciumSC30V

CBI

A calcium sulphate raised access floor is a type of raised floor used mainly in offices, data centres and industrial environments requiring easy passage of cables, fluids and technical equipment under the floor.

Applications

  • Offices and open spaces
  • Data centres and computer rooms
  • Control rooms and laboratories
Show more (1)
  • Spaces requiring increased sound insulation
Brand
CBI
Reference
SC30V
Thickness
30.5 mm
Format
Tile
Family
Raised access floor

  • Modular structure: Made up of removable tiles laid on a steel or aluminium structure, allowing quick access to the installations below
  • Various materials: Calcium sulphate tiles
  • Adjustable height: The structure allows the height to be adjusted according to the volume of cabling and equipment required
  • Cable and fluid management: Provides a dedicated space for organising and protecting electrical cables, networks, air conditioning, etc.
  • Safety and strength: Supports heavy loads and can include antistatic, fire-retardant or acoustic properties as required
  • Easy maintenance and scalability: Quick access to installations for maintenance and modifications

Technical specifications, CBI data sheet

Format600 × 600 mm
Thickness30.5 mm
Panel weight14.5 kg
CoreHigh-density calcium sulphate
Core density1,300 kg/m³
Bottom coveringGalvanised steel tray 0.5 mm
EdgeABS 0,5 mm
Top coveringBare, aluminium, HPL, PVC, linoleum or rubber, as required
Reaction to fire (EN 13501-1)A1, non-combustible
Fire resistance (EN 13501-2)REI 30
Airborne sound insulationDn,f,w 54 dB
Impact soundLn,f,w 41 dB
Walking soundΔLw 31 dB
Load at 2.5 mm deflection4.7 kN
Ultimate load9.7 kN
Load class EN 128254
Life expectancy25 years
Manufacturer warranty24 months

Quote

A quote for Sulfate de calcium · SC30V

Tell us the surface area, the type of premises and your wilaya: we reply with a detailed supply-and-installation quote.

Your data is used only to reply to you — learn more

In the same family

All our references from CBI →

Laying in progress

On our sites

Sonatrach, MTBE Arzew.

1,000 m² of raised floor laid by our crews, from frame to finished room.

  1. 02 Pedestals set and levelled
  2. 03 Panels laid
  3. 04 Room handed over
See the job

01/ 02

Click to zoom · ← → to browse